Expenses:
$0.00
Hours:
0.00
Jan 10, 2024
I'm putting in the floor pan -- I misdrilled the supplied part, so I got a piece of .050 and recut it on the sheer at school.
I choose to use rivnuts instead of the self-tapping screws because I wanted to more reliably install/remove the floor plates.
With the rivnuts in place, I used a strap duplicator to drill through. This proved a lot easier than "drilling from the bottom" as suggested in the plans.
This worked out well since I ended up installing/removing the sheet multiple times to get the cut outs for the brake brackets where I wanted them to be.
Still some final shaping and deburring to do, but the other plates in the baggage area should install a little nicer.

PA-28
PA-28
PA-28
PA-28
CH 750 Cruzer
172
Delta
Glastar
CH-601/601XL
172
CH-601/601XL
RV-7/9
RV-7/9
RV-7/9
RV-7/9
RV-7/9
RV-4
PA-28
PA-28
172
RV-8
RV-8
PA-20/22
PA-20/22
RV-8
T210N
Baron 55
Baron 55
RV-8
Cherokee 180C
Baron 55
M20C M20E M20F
CE23 / CE24
182B/C
Baron 55
R-80 Tiger Moth
Baron 55
Baron 55
Baron 55
Baron 55