Expenses:
$0.00
Hours:
25.00
Jan 23, 2023
Many hours were spend on wiring sensors, crimping, splicing, and re-doing the whole power bus just to make sure most of the breakers still fit in the original place rather than make a bunch of holes in the panel. Added an Avionics Master switch.
Everything ringed out, power and ground is good. Power-on successfull (after getting a better power source, rather than a trickle charger) and getting the settings put in. At this point......it might not take much longer .....
Everything ringed out, power and ground is good. Power-on successfull (after getting a better power source, rather than a trickle charger) and getting the settings put in. At this point......it might not take much longer .....

AA-5
AA-5
AA-5
AA-5
RV-4
RV-10
182P, Q, R, R182, TR182
RV-4
172
172
Patrol
RV-8
172
CH 750 Cruzer
PA-28
PA-28
PA-28
PA-28
CH 750 Cruzer
172
Delta
Glastar
CH-601/601XL
172
CH-601/601XL
RV-7/9
RV-7/9
RV-7/9
RV-7/9
RV-7/9
RV-4
PA-28
PA-28
172
RV-8
RV-8
PA-20/22
PA-20/22
RV-8
T210N