Hours:
8.00
Jan 23, 2022
Started work on the firewall forward components, plumbing and wiring. Carbs and fuel lines installed, electronics installed. Started on the cooling plumbing, but still need to rotate on of the water pump housing outlets. I'll be using the GRT ESI for an engine monitor...as soon as I get that, wiring can start.

PA32R-300
182S
Sling TSi
Sling TSi
Sling TSi
S-7 Courier
M20C M20E M20F
M20C M20E M20F
M20C M20E M20F
Classic
RV-7/9
182S
PA-20/22
S-7 Courier
RV-4
180 / 185
PA32R-300
PA32R-300
172
182S
182S
182S
182S
Baron 55
Baron 55
182P, Q, R, R182, TR182
RV-14
150
M20C M20E M20F
M20C M20E M20F
M20C M20E M20F
Tucano Front Panel
S1/S2
F1 Rocket
CH-601/601XL
PA-28
PA-28
Cherokee 180C
CH-601/601XL
Tucano Front Panel
M20C M20E M20F
M20C M20E M20F
M20C M20E M20F
M20C M20E M20F
M20C M20E M20F
M20C M20E M20F